The Studio has gained experience in the field of public works for the construction of important infrastructures. For the construction of the Turin Line 1 Automated Metro (Collegno Section – Porta Nuova) the role of Operations Director for the Systra Geodata Works Management from 2001 to 2008 and consultancy (analysis and network transfers) for the southern section was held. Lingotto Bengasi. In the railway sector, planning and works management were carried out for non-instrumental buildings for the Ferservizi Spa Companies and Trenitalia Spa of the F.S. Spa. Other experiences have been gained in the field of road infrastructures for the disposal of platform water and management of first rain water (A32 Torino Bardonecchia – A21 Torino Piacenza).